SunGrid Energy SunGrid Energy
Revenue calculator

Solar park revenue calculator.

Model the electricity generation, gross revenue and operating surplus of a solar park from your own assumptions. Results are modelled estimates, not forecasts of any park's results.

Required inputs

Every result depends on these.

Choosing a proposed location fills in its PVGIS modelled yield and the 400 kWp design capacity.

kWp

Peak DC capacity. 1 MWp = 1,000 kWp.

kWh/kWp

Energy per kWp in year 1, after normal system losses.

EUR/MWh

Assumed average price for energy sold in year 1.

EUR/year

Year-1 costs you want included. 0 means none.

% per year

Yearly loss of output, applied from year 2.

years

1 to 25 years.

Optional assumptions

Leave at their defaults to leave them out.

% per year

Default 0: the price stays flat.

% per year

Default 0: costs stay flat.

%

Share of modelled generation actually sold. Default 100. Do not repeat losses already in the yield.

EUR/year

For example land lease or insurance. Default 0.

Download results (CSV)

Formulas

How the results are calculated.

For each year n from 1 to the projection period:

generation(n) = capacity × yield ÷ 1,000 × (1 − degradation)^(n − 1)
sold(n) = generation(n) × availability
price(n) = price × (1 + price escalation)^(n − 1)
gross revenue(n) = sold(n) × price(n)
operating costs(n) = (O&M + other costs) × (1 + cost escalation)^(n − 1)
operating surplus(n) = gross revenue(n) − operating costs(n)

Generation is in MWh, prices in EUR/MWh and money in euros, in nominal terms. Full definitions are on the methodology page.

What the results are not

  • Gross revenue is not profit. It is the value of electricity sold before any costs.
  • Operating surplus deducts only the costs entered above. It is not net profit, cash flow or a return, and leaves out financing, tax, depreciation, fees and any cost not entered.
  • A market price is not a realised price. The Romanian day-ahead reference shows recent wholesale prices, not what any park is paid.
  • Not a forecast of any SunGrid or partner park.